MEIC Document 1-2015 Preparation Site

From Electron Ion Collider Wiki
Revision as of 12:22, 15 December 2014 by Krafft (Talk | contribs)

Jump to: navigation, search

Individual Contributions as suggested in 12-12-2014 email


Introduction: MEIC strategy and recent update Pilat

Overview of the baseline (2.2km footprint) Zhang

Luminosity Performance Zhang

Ion injector complex and transfer lines Bogacz

CEBAF injector, Electron ring and transfer lines Lin

Ion ring Morozov

Polarization Lin, Morozov

Cooling Zhang

RF/SRF Rimmer

Project organization, costs Pilat

Current Document

Jan. 2015 MEIC Summary Document

Current Contributions

  1. Introduction: MEIC strategy and recent update (Pilat)
  2. Overview of the baseline (2.2km footprint)(Zhang)
  3. Luminosity Performance(Zhang)
  4. Ion injector complex and transfer lines(Bogacz)
  5. CEBAF injector, Electron ring and transfer lines(Lin)
  6. Ion ring(Morozov)
  7. Polarization(Lin, Morozov)
  8. Cooling(Zhang)
  9. RF-SRF(Rimmer)
  10. Project organization, costs(Pilat)