MEIC Document 1-2015 Preparation Site

From Electron Ion Collider Wiki
Revision as of 12:07, 15 December 2014 by Krafft (Talk | contribs)

Jump to: navigation, search

Individual Contributions as suggested in 12-12-2014 email


Introduction: MEIC strategy and recent update Pilat

Overview of the baseline (2.2km footprint) Zhang

Luminosity Performance Zhang

Ion injector complex and transfer lines Bogacz

CEBAF injector, Electron ring and transfer lines Lin

Ion ring Morozov

Polarization Lin, Morozov

Cooling Zhang

RF/SRF Rimmer

Project organization, costs Pilat


  1. Jan. 2015 MEIC Summary Document
  2. Jan. 2015 MEIC Summary Document
  3. Jan. 2015 MEIC Summary Document
  4. Jan. 2015 MEIC Summary Document
  5. Jan. 2015 MEIC Summary Document
  6. Jan. 2015 MEIC Summary Document
  7. Jan. 2015 MEIC Summary Document
  8. Jan. 2015 MEIC Summary Document
  9. Jan. 2015 MEIC Summary Document
  10. Jan. 2015 MEIC Summary Document