MEIC Document 1-2015 Preparation Site

From Electron Ion Collider Wiki
Revision as of 12:04, 15 December 2014 by Krafft (Talk | contribs)

Jump to: navigation, search

Individual Contributions as suggested in 12-12-2014 email


[Introduction: MEIC strategy and recent update Pilat] [Overview of the baseline (2.2km footprint) Zhang] Luminosity Performance Zhang Ion injector complex and transfer lines Bogacz CEBAF injector, Electron ring and transfer lines Lin Ion ring Morozov Polarization Lin, Morozov Cooling Zhang RF Rimmer Project organization, costs Pilat


  1. Jan. 2015 MEIC Summary Document
  2. Jan. 2015 MEIC Summary Document
  3. Jan. 2015 MEIC Summary Document
  4. Jan. 2015 MEIC Summary Document
  5. Jan. 2015 MEIC Summary Document
  6. Jan. 2015 MEIC Summary Document
  7. Jan. 2015 MEIC Summary Document
  8. Jan. 2015 MEIC Summary Document
  9. Jan. 2015 MEIC Summary Document
  10. Jan. 2015 MEIC Summary Document