Difference between revisions of "MEIC Document 1-2015 Preparation Site"

From Electron Ion Collider Wiki
Jump to: navigation, search
 
(3 intermediate revisions by one user not shown)
Line 8: Line 8:
 
Luminosity Performance                                      Zhang
 
Luminosity Performance                                      Zhang
  
Interaction Region                                       Morozov
+
Detector Region                                             Morozov
  
 
Ion injector complex and transfer lines                      Bogacz
 
Ion injector complex and transfer lines                      Bogacz
Line 51: Line 51:
 
# [http://casa.jlab.org/MEICSumDoc1-2015/Introduction_1-2015.pdf Introduction: MEIC strategy and recent update (Pilat)]
 
# [http://casa.jlab.org/MEICSumDoc1-2015/Introduction_1-2015.pdf Introduction: MEIC strategy and recent update (Pilat)]
 
# [http://casa.jlab.org/MEICSumDoc1-2015/Overview_1-2015.pdf Overview of the baseline (2.2km footprint)(Zhang)]
 
# [http://casa.jlab.org/MEICSumDoc1-2015/Overview_1-2015.pdf Overview of the baseline (2.2km footprint)(Zhang)]
# [http://casa.jlab.org/MEICSumDoc1-2015/Luminoisity_1-2015.pdf Luminosity Performance(Zhang)]
+
# [http://casa.jlab.org/MEICSumDoc1-2015/Luminosity_1-2015.pdf Luminosity Performance(Zhang)]
 +
# [http://casa.jlab.org/MEICSumDoc1-2015/IR_1-2015.pdf Detector Region (Morozov)]
 
# [http://casa.jlab.org/MEICSumDoc1-2015/Ion_Injector_1-2015.pdf Ion injector complex and transfer lines(Bogacz)]
 
# [http://casa.jlab.org/MEICSumDoc1-2015/Ion_Injector_1-2015.pdf Ion injector complex and transfer lines(Bogacz)]
 
# [http://casa.jlab.org/MEICSumDoc1-2015/Electrons_1-2015.pdf CEBAF injector, Electron ring and transfer lines(Lin)]
 
# [http://casa.jlab.org/MEICSumDoc1-2015/Electrons_1-2015.pdf CEBAF injector, Electron ring and transfer lines(Lin)]

Latest revision as of 10:59, 22 December 2014

Contents

Individual Contributions as suggested in 12-12-2014 email

Introduction: MEIC strategy and recent update Pilat

Overview of the baseline (2.2km footprint) Zhang

Luminosity Performance Zhang

Detector Region Morozov

Ion injector complex and transfer lines Bogacz

CEBAF injector, Electron ring and transfer lines Lin

Ion ring Morozov

Polarization Lin, Morozov

Cooling Zhang

RF/SRF Rimmer

Project organization, costs Pilat


Schedule

Dec. 23 First draft contributions

Dec. 24 First combined document published on Wiki for everyone to see. Comment's on deficiencies send out needed improvements.

Dec. 30 Second drafts due

Dec. 31 Combined second draft published on Wiki. Comments on deficiencies send out needed improvements

Jan. 5 Final drafts due

Jan. 7 Semi-final document due/socialized to rest of lab/needed adjustments made

Jan. 9 Sent out to review committee for use Jan. 12


Current Document

Jan. 2015 MEIC Summary Document


Current Contributions

  1. Introduction: MEIC strategy and recent update (Pilat)
  2. Overview of the baseline (2.2km footprint)(Zhang)
  3. Luminosity Performance(Zhang)
  4. Detector Region (Morozov)
  5. Ion injector complex and transfer lines(Bogacz)
  6. CEBAF injector, Electron ring and transfer lines(Lin)
  7. Ion ring(Morozov)
  8. Polarization(Lin, Morozov)
  9. Cooling(Zhang)
  10. RF-SRF(Rimmer)
  11. Project organization, costs(Pilat)