Project organization, costs                                  Pilat
 
Project organization, costs                                  Pilat
  
== Schedule ==
 
  
 +
== Schedule ==
  
 
Dec. 23      First draft contributions
 
Dec. 23      First draft contributions
Line 44: Line 44:
 
[http://casa.jlab.org/MEICSumDoc1-2015/MEIC_Summary_Document_1-2015.pdf Jan. 2015 MEIC Summary Document]
 
[http://casa.jlab.org/MEICSumDoc1-2015/MEIC_Summary_Document_1-2015.pdf Jan. 2015 MEIC Summary Document]
  
== Current Contributions ==
 
  
 +
== Current Contributions ==
  
 
# [http://casa.jlab.org/MEICSumDoc1-2015/Introduction_1-2015.pdf Introduction: MEIC strategy and recent update (Pilat)]
 
# [http://casa.jlab.org/MEICSumDoc1-2015/Introduction_1-2015.pdf Introduction: MEIC strategy and recent update (Pilat)]

Revision as of 17:54, 15 December 2014

Contents

Individual Contributions as suggested in 12-12-2014 email

Introduction: MEIC strategy and recent update Pilat

Overview of the baseline (2.2km footprint) Zhang

Luminosity Performance Zhang

Ion injector complex and transfer lines Bogacz

CEBAF injector, Electron ring and transfer lines Lin

Ion ring Morozov

Polarization Lin, Morozov

Cooling Zhang

RF/SRF Rimmer

Project organization, costs Pilat


Schedule

Dec. 23 First draft contributions

Dec. 24 First combined document published on Wiki for everyone to see. Comment's on deficiencies send out needed improvements.

Dec. 30 Second drafts due

Dec. 31 Combined second draft published on Wiki. Comments on deficiencies send out needed improvements

Jan. 5 Final drafts due

Jan. 7 semi-final document due/socialized to rest of lab/needed adjustments made

Jan. 9 Sent out to review committee for use Jan. 12


Current Document

Jan. 2015 MEIC Summary Document


Current Contributions

  1. Introduction: MEIC strategy and recent update (Pilat)
  2. Overview of the baseline (2.2km footprint)(Zhang)
  3. Luminosity Performance(Zhang)
  4. Ion injector complex and transfer lines(Bogacz)
  5. CEBAF injector, Electron ring and transfer lines(Lin)
  6. Ion ring(Morozov)
  7. Polarization(Lin, Morozov)
  8. Cooling(Zhang)
  9. RF-SRF(Rimmer)
  10. Project organization, costs(Pilat)