Difference between revisions of "MEIC Document 1-2015 Preparation Site"

From Electron Ion Collider Wiki
Jump to: navigation, search
Line 27: Line 27:
 
Dec. 23      First draft contributions
 
Dec. 23      First draft contributions
  
Dec. 24      First combined document published on Wiki for everyone to see. Comment's on difficiencies send out needed improvements.
+
Dec. 24      First combined document published on Wiki for everyone to see. Comment's on deficiencies send out needed improvements.
  
 
Dec. 30      Second drafts due
 
Dec. 30      Second drafts due
  
Dec. 31      Combined second draft published on Wiki. Comments on difficiencies send out needed improvements
+
Dec. 31      Combined second draft published on Wiki. Comments on deficiencies send out needed improvements
  
 
Jan. 5      Final drafts due
 
Jan. 5      Final drafts due

Revision as of 13:06, 15 December 2014

Individual Contributions as suggested in 12-12-2014 email


Introduction: MEIC strategy and recent update Pilat

Overview of the baseline (2.2km footprint) Zhang

Luminosity Performance Zhang

Ion injector complex and transfer lines Bogacz

CEBAF injector, Electron ring and transfer lines Lin

Ion ring Morozov

Polarization Lin, Morozov

Cooling Zhang

RF/SRF Rimmer

Project organization, costs Pilat

Schedule

Dec. 23 First draft contributions

Dec. 24 First combined document published on Wiki for everyone to see. Comment's on deficiencies send out needed improvements.

Dec. 30 Second drafts due

Dec. 31 Combined second draft published on Wiki. Comments on deficiencies send out needed improvements

Jan. 5 Final drafts due

Jan. 7 semi-final document due/socialized to rest of lab/needed adjustments made

Jan. 9 Sent out to review committee for use Jan. 12


Current Document

Jan. 2015 MEIC Summary Document

Current Contributions

  1. Introduction: MEIC strategy and recent update (Pilat)
  2. Overview of the baseline (2.2km footprint)(Zhang)
  3. Luminosity Performance(Zhang)
  4. Ion injector complex and transfer lines(Bogacz)
  5. CEBAF injector, Electron ring and transfer lines(Lin)
  6. Ion ring(Morozov)
  7. Polarization(Lin, Morozov)
  8. Cooling(Zhang)
  9. RF-SRF(Rimmer)
  10. Project organization, costs(Pilat)