Difference between revisions of "MEIC Document 1-2015 Preparation Site"

From Electron Ion Collider Wiki
Jump to: navigation, search
Line 21: Line 21:
  
 
Project organization, costs                                  Pilat
 
Project organization, costs                                  Pilat
 +
 +
== Current Document ==
 +
 +
 +
== Current Contributions ==
  
  

Revision as of 12:20, 15 December 2014

Individual Contributions as suggested in 12-12-2014 email


Introduction: MEIC strategy and recent update Pilat

Overview of the baseline (2.2km footprint) Zhang

Luminosity Performance Zhang

Ion injector complex and transfer lines Bogacz

CEBAF injector, Electron ring and transfer lines Lin

Ion ring Morozov

Polarization Lin, Morozov

Cooling Zhang

RF/SRF Rimmer

Project organization, costs Pilat

Current Document

Current Contributions

  1. Introduction: MEIC strategy and recent update (Pilat)
  2. Overview of the baseline (2.2km footprint)(Zhang)
  3. Luminosity Performance(Zhang)
  4. Ion injector complex and transfer lines(Bogacz)
  5. CEBAF injector, Electron ring and transfer lines(Lin)
  6. Ion ring(Morozov)
  7. Polarization(Lin, Morozov)
  8. Cooling(Zhang)
  9. RF-SRF(Rimmer)
  10. Project organization, costs(Pilat)