Difference between revisions of "MEIC Document 1-2015 Preparation Site"

From Electron Ion Collider Wiki
Jump to: navigation, search
Line 4: Line 4:
 
Introduction: MEIC strategy and recent update                Pilat
 
Introduction: MEIC strategy and recent update                Pilat
  
[Overview of the baseline (2.2km footprint)                     Zhang]
+
Overview of the baseline (2.2km footprint)                   Zhang
Luminosity Performance                                                 Zhang
+
 
Ion injector complex and transfer lines                           Bogacz
+
Luminosity Performance                                       Zhang
CEBAF injector, Electron ring and transfer lines               Lin
+
 
Ion ring                                                                           Morozov
+
Ion injector complex and transfer lines                     Bogacz
Polarization                                                                     Lin, Morozov
+
 
Cooling                                                                           Zhang
+
CEBAF injector, Electron ring and transfer lines             Lin
RF                                                                                   Rimmer
+
 
Project organization, costs                                             Pilat
+
Ion ring                                                     Morozov
 +
 
 +
Polarization                                                 Lin, Morozov
 +
 
 +
Cooling                                                     Zhang
 +
 
 +
RF/SRF                                                      Rimmer
 +
 
 +
Project organization, costs                                 Pilat
  
  

Revision as of 12:07, 15 December 2014

Individual Contributions as suggested in 12-12-2014 email


Introduction: MEIC strategy and recent update Pilat

Overview of the baseline (2.2km footprint) Zhang

Luminosity Performance Zhang

Ion injector complex and transfer lines Bogacz

CEBAF injector, Electron ring and transfer lines Lin

Ion ring Morozov

Polarization Lin, Morozov

Cooling Zhang

RF/SRF Rimmer

Project organization, costs Pilat


  1. Jan. 2015 MEIC Summary Document
  2. Jan. 2015 MEIC Summary Document
  3. Jan. 2015 MEIC Summary Document
  4. Jan. 2015 MEIC Summary Document
  5. Jan. 2015 MEIC Summary Document
  6. Jan. 2015 MEIC Summary Document
  7. Jan. 2015 MEIC Summary Document
  8. Jan. 2015 MEIC Summary Document
  9. Jan. 2015 MEIC Summary Document
  10. Jan. 2015 MEIC Summary Document