Difference between revisions of "MEIC Document 1-2015 Preparation Site"

From Electron Ion Collider Wiki
Jump to: navigation, search
Line 2: Line 2:
  
  
Introduction: MEIC strategy and recent update                Pilat
+
[Introduction: MEIC strategy and recent update                Pilat]
Overview of the baseline (2.2km footprint)                      Zhang
+
[Overview of the baseline (2.2km footprint)                      Zhang]
 
Luminosity Performance                                                  Zhang
 
Luminosity Performance                                                  Zhang
 
Ion injector complex and transfer lines                          Bogacz
 
Ion injector complex and transfer lines                          Bogacz

Revision as of 12:04, 15 December 2014

Individual Contributions as suggested in 12-12-2014 email


[Introduction: MEIC strategy and recent update Pilat] [Overview of the baseline (2.2km footprint) Zhang] Luminosity Performance Zhang Ion injector complex and transfer lines Bogacz CEBAF injector, Electron ring and transfer lines Lin Ion ring Morozov Polarization Lin, Morozov Cooling Zhang RF Rimmer Project organization, costs Pilat


  1. Jan. 2015 MEIC Summary Document
  2. Jan. 2015 MEIC Summary Document
  3. Jan. 2015 MEIC Summary Document
  4. Jan. 2015 MEIC Summary Document
  5. Jan. 2015 MEIC Summary Document
  6. Jan. 2015 MEIC Summary Document
  7. Jan. 2015 MEIC Summary Document
  8. Jan. 2015 MEIC Summary Document
  9. Jan. 2015 MEIC Summary Document
  10. Jan. 2015 MEIC Summary Document