Requirement Details
Electron Ion Collider
P-IR-VAC.12
Requirement details, history, relationships and interfaces associated with requirement P-IR-VAC.12
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 12/06/2024 11:13 | |||
Identifier: | P-IR-VAC.12 | WBS: | 6.06.02.04 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | The inner beam pipe ( +/- 1.5 m around IP) shall be with a gold coating of 5 um | ||
Comments: |
Record Date: 12/06/2024 11:10 | |||
Identifier: | P-IR-VAC.12 | WBS: | 6.06.02.04 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Reviewed | |
Description: | The average vacuum level (after conditioning for >1000Ah) in the IR HSR Rear vac-2 shall be <1x10-10 Torr | ||
Comments: |
Parents | |
F-IR-VAC.4 | The IR Vacuum chamber impedance shall be sufficiently small as to prevent any undesirable beam dynamic issues and adverse heating of vacuum components. |
F-IR-VAC.3 | The IR central vacuum chamber shall be designed to minimize secondary particle production. |
F-IR-VAC.5 | The IR vacuum pressure around the IP from at least -15m to +15m shall be low enough to ensure the beam gas background for the experiment is adequate after the system has been properly conditioned. |
Children | |
No children. |
This function not yet implemented.