Requirement Details
Electron Ion Collider

R-IR-RF-CCAV:197.01.03
Requirement details, history, relationships and interfaces associated with requirement R-IR-RF-CCAV:197.01.03
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 01/15/2026 00:25 | |||
| Identifier: | R-IR-RF-CCAV:197.01.03 | WBS: | |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | RF Pre-Installation shall provide all distribution design, materials, and installation of the piping (or hoses) for Low Conductivity Water (LCW) from the tunnel header to the Cryomodules to be utilized by SRF Systems. | ||
| Comments: | |||
No archive versions
| Parents | |
| No parents. | |
| Children | |
| No children. |
This function not yet implemented.