Requirement Details
Electron Ion Collider
P-IR-INST-ESR_BPM.2
Requirement details, history, relationships and interfaces associated with requirement P-IR-INST-ESR_BPM.2
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 12/06/2024 11:10 | |||
Identifier: | P-IR-INST-ESR_BPM.2 | WBS: | 6.06.02.05 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | For the 2nC pilot bunch, BPM pickups shall be designed to provide the required measurement resolution over the range of H=+/-50, V=+/-10 um | ||
Comments: |
No archive versions
Parents | |
F-IR-INST.1 | The IR shall have the instrumentation needed to measure the beam position of both electron and hadron beams. |
Children | |
No children. |
This function not yet implemented.