Requirement Details
Electron Ion Collider

F-HSR-STR-INST-LPM.1
Requirement details, history, relationships and interfaces associated with requirement F-HSR-STR-INST-LPM.1
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 02/13/2025 19:28 | |||
| Identifier: | F-HSR-STR-INST-LPM.1 | WBS: | 6.05.05 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The HSR Longitudinal Profile Monitor (LPM) instrumentation shall be strategically placed around the HSR and be capable of operating in all parameter configurations defined in the MPT. [Document: EIC-SEG-RSI-005] | ||
| Comments: | |||
No archive versions
| Parents | |
| G-HSR.10 | The HSR Ion bunches shall meet the parameters specified for different species defined in MPT. [Document#:EIC-SEG-RSI-005] |
| G-HSR.15 | All HSR components and systems shall be designed and installed in line with all relevant regulatory codes and in full compliance with BNL SBMS. |
| Children | |
| No children. | |
This function not yet implemented.