Requirement Details
Electron Ion Collider
F-HSR-SNAK.10
Requirement details, history, relationships and interfaces associated with requirement F-HSR-SNAK.10
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 12/06/2024 11:10 | |||
Identifier: | F-HSR-SNAK.10 | WBS: | 6.05 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | Two snakes shall be transferred over from the Blue ring. | ||
Comments: |
No archive versions
Parents | |
G-HSR.02 | The HSR shall deliver Protons bunches having at least a 70% polarization at full beam energy ready for collision. |
G-HSR.03 | The HSR shall deliver 3He bunches having at least a 70% polarization at full beam energy ready for collision. |
G-HSR.04 | Design of the Hadron storage ring shall allow the possibility of future operation with a polarized deuteron beam. |
Children | |
No children. |
This function not yet implemented.