Requirement Details
Electron Ion Collider

P-HSR-RF-ACAV:197.02.02
Requirement details, history, relationships and interfaces associated with requirement P-HSR-RF-ACAV:197.02.02
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 08/15/2025 00:29 | |||
| Identifier: | P-HSR-RF-ACAV:197.02.02 | WBS: | 6.08.05.07 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The NCRF Cavity System cooling water subsystem shall be designed to utilize the supply characteristics as defined by the EIC Infrastructure Utility Requirements Document (Doc. No. EIC-IFD-RSI-012). | ||
| Comments: | |||
| Record Date: 05/16/2025 17:04 | |||
| Identifier: | P-HSR-RF-ACAV:197.02.02 | WBS: | 6.08.05.08 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The NCRF Cavity System cooling water subsystem shall be designed to utilize the supply characteristics as defined by the EIC Infrastructure Utility Requirements Document (Doc. No. EIC-IFD-RSI-012). | ||
| Comments: | |||
| Record Date: 05/15/2025 20:34 | |||
| Identifier: | P-HSR-RF-ACAV:197.02.02 | WBS: | |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | ||
| Description: | The NCRF Cavity System cooling water subsystem shall be designed to utilize the supply characteristics as defined by the EIC Infrastructure Utility Requirements Document (Doc. No. EIC-IFD-RSI-012). | ||
| Comments: | |||
| Record Date: 04/29/2025 21:28 | |||
| Identifier: | P-HSR-RF-ACAV:197.02.02 | WBS: | 6.08.05.08 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The NCRF Cavity System cooling water subsystem shall be designed to utilize the supply characteristics as defined by the EIC Infrastructure Utility Requirements Document (Doc. No. EIC-IFD-RSI-012). | ||
| Comments: | |||
| Record Date: 04/22/2025 17:17 | |||
| Identifier: | P-HSR-RF-ACAV:197.02.02 | WBS: | 6.08.05.08 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Reviewed | |
| Description: | The NCRF Cavity System chilled water and low-conductivity water operational supply temperature range shall be 26.5 ± 3 °C. | ||
| Comments: | |||
| Record Date: 04/21/2025 19:05 | |||
| Identifier: | P-HSR-RF-ACAV:197.02.02 | WBS: | 6.08.05.08 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | The NCRF Cavity System shall be outfitted with flow control, thermometry, vacuum pressure, and RF instrumentation as to monitor and control all sub-systems during operation and testing. | ||
| Comments: | |||
| Parents | |
| No parents. | |
| Children | |
| No children. |
This function not yet implemented.