Requirement Details
Electron Ion Collider
F-HSR-INST.04
Requirement details, history, relationships and interfaces associated with requirement F-HSR-INST.04
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 04/03/2025 17:26 | |||
Identifier: | F-HSR-INST.04 | WBS: | |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The 41 GeV operation mode, which utilizes a different arc in the 12-2 sextant, shall have the same capability of beam diagnostics as the high energy operation modes defined in the MPT. Refer to [Document#:EIC-SEG-RSI-005]. | ||
Comments: |
Record Date: 04/02/2025 20:22 | |||
Identifier: | F-HSR-INST.04 | WBS: | |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The 41 GeV operation mode, which utilizes a different arc in the 12-2 sextant, shall have the same capability of beam diagnostics as the high energy operation modes defined in the MPT. | ||
Comments: |
Parents | |
No parents. | |
Children | |
No children. |
This function not yet implemented.