Requirement Details
Electron Ion Collider
F-HSR-INST-INJ_PSBPM.1
Requirement details, history, relationships and interfaces associated with requirement F-HSR-INST-INJ_PSBPM.1
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 12/06/2024 11:10 | |||
Identifier: | F-HSR-INST-INJ_PSBPM.1 | WBS: | 6.05 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | Phosphor screen beam profile monitors (plunging) with the same requirements as similar ones existing in the ATR beamline shall be added in the extension of the ATR Y-line at 5 o’clock area and in the transfer line at 4 o’clock area [5.8]. | ||
Comments: |
No archive versions
Parents | |
G-HSR.10 | The proton bunches delivered by the HSR shall meet all the criteria set forth in the MPT [5.9] tables 1 and 2. |
G-HSR.11 | The Au ion bunches delivered by the HSR shall meet all the criteria set forth in the MPT [5.9] tables 1 and 2. |
G-HSR.16 | The Proton injection criteria shall be as defined in MPT see [5.9] table 4. |
G-HSR.18 | The 3He ion injection criteria shall be as defined in MPT see [5.9] table 4. |
Children | |
No children. |
This function not yet implemented.