Requirement Details
Electron Ion Collider
P-HSR-INST-BPM-WARM_PU.4
Requirement details, history, relationships and interfaces associated with requirement P-HSR-INST-BPM-WARM_PU.4
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 10/10/2024 14:48 | |||
Identifier: | P-HSR-INST-BPM-WARM_PU.4 | WBS: | 6.05.05.01 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | The Q1 and Q3 cryogenic BPM pickups shall be shielded by beam screens for the triplets | ||
Comments: |
No archive versions
Parents | |
F-HSR-INST.5 | The 41 GeV operation mode, which utilizes a different arc in the 10-12 sextant, shall have the same capability of beam diagnostics as the high energy operation modes [5.9]. |
Children | |
No children. |
This function not yet implemented.