Requirement Details
Electron Ion Collider

F-HSR-INJ-VAC.02
Requirement details, history, relationships and interfaces associated with requirement F-HSR-INJ-VAC.02
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 08/11/2025 17:25 | |||
| Identifier: | F-HSR-INJ-VAC.02 | WBS: | 6.05.05.02 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | A ~20m section of the warm injection beamline near the HSR including the injection septum shall have a vacuum pressure of ~1E-10 torr or better, after baking . | ||
| Comments: | |||
| Record Date: 05/16/2025 17:04 | |||
| Identifier: | F-HSR-INJ-VAC.02 | WBS: | 6.05.05.02 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | A ~20m section of the warm injection beamline near the HSR including the injection septum shall have a vacuum pressure of ~1E-10 torr or better, after baking . | ||
| Comments: | |||
| Record Date: 05/15/2025 20:34 | |||
| Identifier: | F-HSR-INJ-VAC.02 | WBS: | |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | ||
| Description: | A ~20m section of the warm injection beamline near the HSR including the injection septum shall have a vacuum pressure of ~1E-10 torr or better, after baking . | ||
| Comments: | |||
| Record Date: 04/03/2025 17:26 | |||
| Identifier: | F-HSR-INJ-VAC.02 | WBS: | 6.05.05.02 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | A ~20m section of the warm injection beamline near the HSR including the injection septum shall have a vacuum pressure of ~1E-10 torr or better, after baking . | ||
| Comments: | |||
| Record Date: 01/27/2025 16:43 | |||
| Identifier: | F-HSR-INJ-VAC.2 | WBS: | 6.05.03 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The vaccuum level in the HSR transport line shall be kept at the same level as in the current ATR line. | ||
| Comments: | |||
| Parents | |
| G-HSR.18 | The HSR shall utilize an Injection system to provide the ability for single bunch transport and Injection at IR4. |
| Children | |
| No children. | |
This function not yet implemented.