Requirement Details
Electron Ion Collider
G-GBL-UPGRADES.03
Requirement details, history, relationships and interfaces associated with requirement G-GBL-UPGRADES.03
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 09/25/2024 16:11 | |||
Identifier: | G-GBL-UPGRADES.03 | WBS: | 6 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | Integrating a second detector is achieved by designing the present beam trajectories in the possible area for the next IR around IP8 such that a second IR can be introduced without imposing a difference | ||
Comments: |
No archive versions
Parents | |
No parents. | |
Children | |
No children. |
This function not yet implemented.