Requirement Details
Electron Ion Collider

G-GBL-SAFETY_EGRESS.01
Requirement details, history, relationships and interfaces associated with requirement G-GBL-SAFETY_EGRESS.01
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 05/16/2025 17:04 | |||
| Identifier: | G-GBL-SAFETY_EGRESS.01 | WBS: | 6.0 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | New construction in the collider complex must be constructed such as to avoid confined space in areas that must be entered by personnel for maintenance and repair. GBL SAFETY_EGRESS.02 Shall avoiding confined space in areas that must be entered by personnel not be possible or lead to unreasonable conditions, the collider design must include mitigation of the corresponding hazard. | ||
| Comments: | |||
| Record Date: 05/15/2025 20:34 | |||
| Identifier: | G-GBL-SAFETY_EGRESS.01 | WBS: | |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | ||
| Description: | New construction in the collider complex must be constructed such as to avoid confined space in areas that must be entered by personnel for maintenance and repair. GBL SAFETY_EGRESS.02 Shall avoiding confined space in areas that must be entered by personnel not be possible or lead to unreasonable conditions, the collider design must include mitigation of the corresponding hazard. | ||
| Comments: | |||
| Record Date: 03/04/2025 19:37 | |||
| Identifier: | G-GBL-SAFETY_EGRESS.01 | WBS: | 6.0 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | New construction in the collider complex must be constructed such as to avoid confined space in areas that must be entered by personnel for maintenance and repair. GBL SAFETY_EGRESS.02 Shall avoiding confined space in areas that must be entered by personnel not be possible or lead to unreasonable conditions, the collider design must include mitigation of the corresponding hazard. | ||
| Comments: | |||
| Record Date: 02/25/2025 20:15 | |||
| Identifier: | G-GBL-SAFETY_EGRESS.01 | WBS: | 6 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | New construction in the collider complex must be constructed such as to avoid confined space in areas that must be entered by personnel for maintenance and repair. GBL SAFETY_EGRESS.02 Shall avoiding confined space in areas that must be entered by personnel not be possible or lead to unreasonable conditions, the collider design must include mitigation of the corresponding hazard. | ||
| Comments: | |||
| Parents | |
| No parents. | |
| Children | |
| No children. |
This function not yet implemented.