Requirement Details
Electron Ion Collider
G-GBL-OPEREFF.02
Requirement details, history, relationships and interfaces associated with requirement G-GBL-OPEREFF.02
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 03/04/2025 19:37 | |||
Identifier: | G-GBL-OPEREFF.02 | WBS: | 6.0 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | Operating procedures which minimize the time between collision runs which includes the time for beam injection, collision adjustment and tuning shall be required to achieve high levels of operational efficiency and reliability to maximize the physics outcome. | ||
Comments: |
Record Date: 02/25/2025 20:15 | |||
Identifier: | G-GBL-OPEREFF.02 | WBS: | 6 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | Operating procedures which minimize the time between collision runs which includes the time for beam injection, collision adjustment and tuning shall be required to achieve high levels of operational efficiency and reliability to maximize the physics outcome. | ||
Comments: |
Parents | |
No parents. | |
Children | |
No children. |
This function not yet implemented.