Requirement Details
Electron Ion Collider
G-ESR.15
Requirement details, history, relationships and interfaces associated with requirement G-ESR.15
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 03/18/2025 18:05 | |||
Identifier: | G-ESR.15 | WBS: | 6.04 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The ESR shall be designed to minimize unscheduled downtime, maintenance time and repair time to achieve EIC operational availability. | ||
Comments: |
Record Date: 03/03/2025 18:11 | |||
Identifier: | G-ESR.15 | WBS: | 6.04 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | All ESR components and systems shall be designed and installed in line with all relevant regulatory codes and in full compliance with BNL SBMS. | ||
Comments: |
Record Date: 02/24/2025 18:26 | |||
Identifier: | G-ESR.15 | WBS: | 6.07.02 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The ESR shall have provisions made to accommodate a control system which can operate the ESR consistent will the overall control of the other EIC system's and to ensure the ESR meets all the Physics requirements needed to deliver the physics goals of the EIC. | ||
Comments: |
Record Date: 01/27/2025 16:43 | |||
Identifier: | G-ESR.15 | WBS: | 6.07.02 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The ESR shall have a control system which can operate the ESR consistent will the overall control of the other EIC system's and to ensure the ESR meets all the Physics requirements needed to deliver the physics goals of the EIC. | ||
Comments: |
Parents | |
No parents. | |
Children | |
F-EIS.2x | The EIS shall contain an Abort system to dump the beam and protect the system when required |
F-ESR-COLL.01 | The ESR shall have a collimation system capable of ensuring a sufficiently low background at the detector. |
F-ESR-COLL.02 | The ESR shall have a collimation system capable protecting all machine elements in case of failure. |
F-ESR-MPS-ABORT.02 | The ESR Abort system shall contain a beam dump to safely absorb the energy of the stored beam in a controlled fashion. |
F-ESR-MPS-ABORT.01 | The ESR shall contain an Abort system to dump the beam. |
F-ESR.05 | The ESR shall reach an availability consistent with the overall availability of the entire EIC as specified in the MPT. [Document#:EIC-SEG-RSI-005] |
This function not yet implemented.