Requirement Details
Electron Ion Collider
G-ESR.15
Requirement details, history, relationships and interfaces associated with requirement G-ESR.15
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 12/06/2024 11:10 | |||
Identifier: | G-ESR.15 | WBS: | 6.04 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | The ESR shall have a control system which can operate the ESR consistent will the overall control of the other EIC system's and to ensure the ESR meets all the Physics requirements needed to deliver the physics goals of the EIC. | ||
Comments: |
No archive versions
Parents | |
No parents. | |
Children | |
F-ESR-CONT.1 | The ESR control system shall facilitate all ESR global control requirements.  |
F-ESR-CONT.2 | The ESR control system shall facilitate all network, relational database and data archiving required. |
F-ESR-CONT.3 | The control system shall facilitate all machine protection systems required |
F-ESR-CONT.4 | The ESR control system shall facilitate all EIC machine timing required. |
F-ESR-CONT.5 | The ESR control system shall facilitate fast feedback integration systems required. The child for this are in the IR need to identify the magnets . These will be low inductance correctors . |
F-ESR-CONT.6 | The ESR control system shall facilitate all physics application support required. |
F-ESR-INST.1 | The instrumentation system shall include dual-plane beam position monitors (BPMs) adjacent to specified quadrupoles. |
F-ESR-INST.2 | The BPMs shall have turn-by-turn orbit measurement capability based on a single, remotely selectable bunch out of the fully filled bunch train to enable injection optimization. |
F-ESR-INST.3 | The instrumentation system shall include a beam current monitor to measure average beam current |
F-ESR-INST.4 | The instrumentation system shall include a system to measure individual bunch charges and bunch pattern |
F-ESR-INST.5 | The instrumentation system shall include a system to measure transverse beam profiles |
F-ESR-INST.6 | The instrumentation system shall include a system to measure longitudinal beam profiles |
F-ESR-INST.7 | The longitudinal bunch profile monitor needs turn-by-turn capability based on a single bunch in the fully filled bunch train to allow timing and energy adjustment for injection optimization. |
F-ESR-INST.8 | The instrumentation system shall include system to measure H & V betatron tunes. |
F-ESR-INST.9 | The instrumentation system shall facilitate all required feedback systems (slow transverse, longitudinal and transverse bunch-by-bunch) |
F-ESR-INST.10 | The instrumentation system shall include beam loss monitor system with detectors located only at select regions of the ESR. |
F-ESR-RF.8 | The RF system controls shall be designed to handle the transient beam loading for all necessary bunch patterns. |
F-ESR-RF.9 | The HSR Ring RF system shall provide controls and diagnostics for all cavity and system functionality. |
This function not yet implemented.