Requirement Details
Electron Ion Collider
G-ESR.13
Requirement details, history, relationships and interfaces associated with requirement G-ESR.13
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 01/27/2025 16:43 | |||
Identifier: | G-ESR.13 | WBS: | 6.04 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The ESR shall be designed to minimize unscheduled downtime, maintenance time and repair time to achieve EIC operational availability. | ||
Comments: |
No archive versions
Parents | |
No parents. | |
Children | |
F-EIS.10 | The EIS shall contain an Abort system to dump the beam and protect the system when required |
F-ESR-PROT-COLL.1 | The ESR shall have a collimation system capable of ensuring a sufficiently low background at the detector. |
F-ESR-PROT-COLL.2 | The ESR shall have a collimation system capable protecting all machine elements in case of failure. |
F-ESR-PROT.2 | The ESR Abort system shall contain a beam to dump to safely absorb the energy of the dumped beam in a controlled fashion. |
F-ESR-PROT.1 | The ESR shall contain an Abort system to dump the beam |
F-ESR.5 | The ESR shall reach an availability consistent with the overall availability of the entire EIC as specified in the MPT. [Document#:EIC-SEG-RSI-005] |
This function not yet implemented.