Requirement Details
Electron Ion Collider

P-ESR-RF-SRF-ACAV:591S-FA.04.06
Requirement details, history, relationships and interfaces associated with requirement P-ESR-RF-SRF-ACAV:591S-FA.04.06
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 10/12/2026 19:31 | |||
| Identifier: | P-ESR-RF-SRF-ACAV:591S-FA.04.06 | WBS: | 6.02.02.07.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The SRF Cryomodule components that can be maintained in-situ shall have an annual minimum radiation tolerance of 1 kGy. | ||
| Comments: | |||
No archive versions
| Parents | |
| F-ESR-RF-SRF.06.02 | The ESR RF Systems within the tunnel shall operate within its yearly radiation exposure budget. |
| F-ESR-RF-SRF.06.04 | The ESR RF Systems shall have a minimum operating lifetime of 20 years |
| F-ESR-RF-SRF.06.05 | The ESR RF System shall be designed to minimize unscheduled downtime, maintenance time and repair time to achieve ESR operational availability. |
| F-ESR-RF-SRF.06.08 | The ESR RF Systems active frequency tuning system shall be maintainable in-situ. |
| F-ESR-RF-SRF.06.09 | The ESR RF Systems air-side FPC components shall be maintainable in-situ. |
| Children | |
| No children. | |
This function not yet implemented.