Requirement Details
Electron Ion Collider

R-ESR-PS-QS:25.05.02
Requirement details, history, relationships and interfaces associated with requirement R-ESR-PS-QS:25.05.02
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 01/08/2026 01:33 | |||
| Identifier: | R-ESR-PS-QS:25.05.02 | WBS: | 6.02.02.04 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Reviewed | |
| Description: | ASR System Installation and Final Integration shall provide funding and scheduling for the installation of AC cable distribution by the appropriate technical support group which satisfies the power supply group design into each power supply rack. | ||
| Comments: | |||
| Record Date: 11/25/2025 00:12 | |||
| Identifier: | R-ESR-PS-QS:25.05.02 | WBS: | 6.04.04 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | Accelerator Installation Group shall provide funding and scheduling for the installation of UPS and AC cable distribution cabling by the appropriate technical support group which satisfies the power supply group design into each power supply rack. | ||
| Comments: | |||
| Parents | |
| No parents. | |
| Children | |
| No children. |