Requirement Details
Electron Ion Collider

F-ESR-MPS-ABORT.02
Requirement details, history, relationships and interfaces associated with requirement F-ESR-MPS-ABORT.02
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 02/09/2026 20:55 | |||
| Identifier: | F-ESR-MPS-ABORT.02 | WBS: | 6.04.04.03.01.02 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The ESR Abort system shall contain a beam dump to safely absorb the energy of the stored beam in a controlled fashion. | ||
| Comments: | |||
| Record Date: 05/16/2025 17:04 | |||
| Identifier: | F-ESR-MPS-ABORT.02 | WBS: | 6.06.03 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The ESR Abort system shall contain a beam dump to safely absorb the energy of the stored beam in a controlled fashion. | ||
| Comments: | |||
| Record Date: 05/15/2025 20:34 | |||
| Identifier: | F-ESR-MPS-ABORT.02 | WBS: | |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | ||
| Description: | The ESR Abort system shall contain a beam dump to safely absorb the energy of the stored beam in a controlled fashion. | ||
| Comments: | |||
| Record Date: 03/13/2025 17:22 | |||
| Identifier: | F-ESR-MPS-ABORT.02 | WBS: | 6.06.03 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The ESR Abort system shall contain a beam dump to safely absorb the energy of the stored beam in a controlled fashion. | ||
| Comments: | |||
| Parents | |
| G-ESR.15 | The ESR shall be designed to minimize unscheduled downtime, maintenance time and repair time to achieve EIC operational availability. |
| Children | |
| P-ESR-MPS-EXT_KICK-DUMP_BLK.01 | The diameter shall be 90 mm |
| P-ESR-MPS-EXT_KICK-DUMP_BLK.02 | The length shall be 2 m |
| P-ESR-MPS-EXT_KICK-DUMP_BLK.03 | The materials shall be C / Al / Cu |
| P-ESR-MPS-EXT_KICK-DUMP_BLK.04 | The energy deposited during abort shall be 320 kJ |
| P-ESR-MPS-EXT_KICK-DUMP_BLK.06 | The window thickness shall be tbd mm |
| P-ESR-MPS-EXT_KICK-DUMP_BLK.05 | The frequency of thermal cycle shall be 1 hour |
| P-ESR-MPS-EXT_KICK-DUMP_BLK.07 | The window material shall be tbd |
This function not yet implemented.