Requirement Details
Electron Ion Collider

F-ESR-MPS-ABORT.01
Requirement details, history, relationships and interfaces associated with requirement F-ESR-MPS-ABORT.01
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 05/16/2025 17:04 | |||
| Identifier: | F-ESR-MPS-ABORT.01 | WBS: | 6.06.03 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The ESR shall contain an Abort system to dump the beam. | ||
| Comments: | |||
| Record Date: 05/15/2025 20:34 | |||
| Identifier: | F-ESR-MPS-ABORT.01 | WBS: | |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | ||
| Description: | The ESR shall contain an Abort system to dump the beam. | ||
| Comments: | |||
| Record Date: 03/13/2025 17:22 | |||
| Identifier: | F-ESR-MPS-ABORT.01 | WBS: | 6.06.03 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The ESR shall contain an Abort system to dump the beam. | ||
| Comments: | |||
| Parents | |
| G-ESR.15 | The ESR shall be designed to minimize unscheduled downtime, maintenance time and repair time to achieve EIC operational availability. |
| Children | |
| P-ESR-MPS-EXT_KICK-DUMP_BLK.01 | The diameter shall be 90 mm |
| P-ESR-MPS-EXT_KICK-DUMP_BLK.02 | The length shall be 2 m |
| P-ESR-MPS-EXT_KICK-DUMP_BLK.03 | The materials shall be C / Al / Cu |
| P-ESR-MPS-EXT_KICK-DUMP_BLK.04 | The energy deposited during abort shall be 320 kJ |
| P-ESR-MPS-EXT_KICK-DUMP_BLK.05 | The frequency of thermal cycle shall be 1 hour |
| P-ESR-MPS-EXT_KICK-DUMP_BLK.06 | The window thickness shall be tbd mm |
| P-ESR-MPS-EXT_KICK-DUMP_BLK.07 | The window material shall be tbd |
| P-ESR-MPS-EXT_KICK-INST_BP.01 | The Length shall be 50 m |
| P-ESR-MPS-EXT_KICK-INST_BP.02 | The Internal diameter shall be 90 mm |
| P-ESR-MPS-EXT_KICK-INST_BP.03 | The Temperature sensors shall be yes |
| P-ESR-MPS-EXT_KICK-INST_BP.04 | The BPMs shall be 4 |
| P-ESR-MPS-EXT_KICK-INST_BP.05 | The Correctors shall be 4 |
| P-ESR-MPS-EXT_KICK-INST_BP.06 | The Corrector PS shall be tbd |
| P-ESR-MPS-EXT_KICK-INST_BP.07 | The power supply accuracy shall be tbd |
| P-ESR-MPS-EXT_KICK-INST_BP.08 | The Cooling / pumping shall be yes |
| P-ESR-MPS-EXT_KICK-LAMBERT.01 | The deflection shall be 2 mrad |
| P-ESR-MPS-EXT_KICK-LAMBERT.02 | The length shall be 1.2 m |
| P-ESR-MPS-EXT_KICK-LAMBERT.03 | The power supply shall be 1600 A |
| P-ESR-MPS-EXT_KICK-LAMBERT.04 | The power supply accuracy shall be TBD |
| P-ESR-MPS-EXT_KICK-LAMBERT.05 | The Y-chamber aperture shall be 36 mm |
| P-ESR-MPS-EXT_KICK-LAMBERT.06 | May need to add additional window requirements for other leg of Lambertson magnet TBD |
| P-ESR-MPS-EXT_KICK-QUAD.01 | The gradient shall be 17 T/m |
| P-ESR-MPS-EXT_KICK-QUAD.02 | The power supply shall be 1600 A |
| P-ESR-MPS-EXT_KICK-QUAD.03 | The power supply accuracy shall be TBD |
| P-ESR-MPS-EXT_KICK-QUAD.04 | The length shall be 70 cm |
| P-ESR-MPS-EXT_KICK-QUAD.05 | The aperture radius shall be 50 mm |
| P-ESR-MPS-EXT_KICK.01 | The number of kickers shall be 6 |
| P-ESR-MPS-EXT_KICK.02 | The Rise time shall be 900 ns |
| P-ESR-MPS-EXT_KICK.03 | The Fall time shall be NA sec |
| P-ESR-MPS-EXT_KICK.04 | The flat top time shall be 13 us |
| P-ESR-MPS-EXT_KICK.05 | The waveshape shall be trap |
| P-ESR-MPS-EXT_KICK.06 | The painting shall be vertical |
| P-ESR-MPS-EXT_KICK.07 | The maximum field shall be 0.12 T |
| P-ESR-MPS-EXT_KICK.08 | The total deflection shall be 16 mrad |
| P-ESR-MPS-EXT_KICK.09 | The maximum current shall be TBD |
| P-ESR-MPS-EXT_KICK.10 | The maximum voltage shall be TBD |
| P-ESR-MPS-EXT_KICK.11 | The inductance with cable shall be TBD (uH) |
| P-ESR-MPS-EXT_KICK.12 | The Max rep rate shall be 100 kV/pC |
| P-ESR-MPS-EXT_KICK.13 | The flat top repeatability shall be NA Hz |
| P-ESR-MPS-EXT_KICK.15 | The beam abort kicker shall be tbd % |
| P-ESR-MPS-EXT_KICK.14 | The flatness of flat top/pulse form shall be 1 % |
| P-ESR-MPS-EXT_KICK.16 | The cooling type shall be w (W,A) |
This function not yet implemented.