Requirement Details
Electron Ion Collider

P-ESR-MAG-TH:20.09
Requirement details, history, relationships and interfaces associated with requirement P-ESR-MAG-TH:20.09
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 05/16/2025 17:04 | |||
| Identifier: | P-ESR-MAG-TH:20.09 | WBS: | 6.04.03.02 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The magnet design and verification process shall ensure the final magnet will meet the reliability needs of the EIC over it planned operational life of >20 Years. | ||
| Comments: | |||
| Record Date: 05/15/2025 20:34 | |||
| Identifier: | P-ESR-MAG-TH:20.09 | WBS: | |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | ||
| Description: | The magnet design and verification process shall ensure the final magnet will meet the reliability needs of the EIC over it planned operational life of >20 Years. | ||
| Comments: | |||
| Record Date: 04/15/2025 20:35 | |||
| Identifier: | P-ESR-MAG-TH:20.09 | WBS: | 6.04.03.02 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The magnet design and verification process shall ensure the final magnet will meet the reliability needs of the EIC over it planned operational life of >20 Years. | ||
| Comments: | |||
| Parents | |
| F-ESR.05 | The ESR shall reach an availability consistent with the overall availability of the entire EIC as specified in the GRD. [Document#:EIC-SEG-RSI-010] |
| Children | |
| No children. | |
This function not yet implemented.