Requirement Details
Electron Ion Collider
F-ESR-INST.9
Requirement details, history, relationships and interfaces associated with requirement F-ESR-INST.9
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 10/10/2024 14:48 | |||
Identifier: | F-ESR-INST.9 | WBS: | 6.04 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | The instrumentation system shall facilitate all required feedback systems (slow transverse, longitudinal and transverse bunch-by-bunch) | ||
Comments: |
No archive versions
Parents | |
G-ESR.3 | The ESR shall provide electron bunches having the bunch parameters specified in [10]Â |
G-ESR.15 | The ESR shall have a control system which can operate the ESR consistent will the overall control of the other EIC system's and to ensure the ESR meets all the Physics requirements needed to deliver the physics goals of the EIC. |
Children | |
P-ESR-CONT-FEEDBACK.1 | The slow orbit feedback BPM data averaging period shall be tbd - |
P-ESR-CONT-FEEDBACK.2 | The slow orbit feedback correction output rate shall be 10 Hz |
P-ESR-INST-TRANSSLFB.1 | The transverse slow feedback system bandwidth shall bs 10 Hz |
This function not yet implemented.