Requirement Details
Electron Ion Collider
F-ESR-INST.08
Requirement details, history, relationships and interfaces associated with requirement F-ESR-INST.08
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 05/16/2025 17:04 | |||
Identifier: | F-ESR-INST.08 | WBS: | 6.04.06 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The ESR instrumentation system shall include system to measure H & V betatron tunes. | ||
Comments: |
Record Date: 05/15/2025 20:34 | |||
Identifier: | F-ESR-INST.08 | WBS: | |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | ||
Description: | The ESR instrumentation system shall include system to measure H & V betatron tunes. | ||
Comments: |
Record Date: 02/24/2025 18:26 | |||
Identifier: | F-ESR-INST.08 | WBS: | 6.04.06 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The ESR instrumentation system shall include system to measure H & V betatron tunes. | ||
Comments: |
Record Date: 02/13/2025 19:28 | |||
Identifier: | F-ESR-INST.8 | WBS: | 6.04.06 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Reviewed | |
Description: | The instrumentation system shall include system to measure H & V betatron tunes. | ||
Comments: |
Record Date: 01/27/2025 16:43 | |||
Identifier: | F-ESR-INST.8 | WBS: | 6.04.06 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Reviewed | |
Description: | The instrumentation system shall include system to measure H & V betatron tunes. | ||
Comments: |
Parents | |
G-ESR.03 | The ESR shall provide electron bunches having the bunch parameters specified in the MPT. [Document#:EIC-SEG-RSI-005] |
G-ESR.17 | The ESR shall have provisions made to accommodate a control system which can operate the ESR consistent will the overall control of the EIC and other EIC systems and to ensure the ESR meets all the Physics requirements needed to deliver the physics goals of the EIC. |
Children | |
P-ESR-INST-TMK.01 | Stripline kickers (H & V) shall be used to excite the beam so tunes can be measured using turn-by-turn BPM data. |
P-ESR-INST-TMK.02 | The magnitude of the kick required for the horizontal kicker shall be TBD units |
P-ESR-INST-TMK.03 | The magnitude of the kick required for the vertical kicker shall be TBD units |
P-ESR-INST-TMK.05 | The location of the tune meter kicker striplines in the ESR shall be TBD units |
P-ESR-INST-TMK.04 | The kicker waveform (risetime and shape) requirements shall be TBD units |
P-ESR-INST-TMK.06 | The impedance of the kicker beamline device shall be approved by beam Physics. |
This function not yet implemented.