Requirement Details
Electron Ion Collider
F-ESR-INST.05
Requirement details, history, relationships and interfaces associated with requirement F-ESR-INST.05
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 05/16/2025 17:04 | |||
Identifier: | F-ESR-INST.05 | WBS: | 6.04.06 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The ESR instrumentation system shall include a system to measure transverse beam profiles. | ||
Comments: |
Record Date: 05/15/2025 20:34 | |||
Identifier: | F-ESR-INST.05 | WBS: | |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | ||
Description: | The ESR instrumentation system shall include a system to measure transverse beam profiles. | ||
Comments: |
Record Date: 03/19/2025 17:11 | |||
Identifier: | F-ESR-INST.05 | WBS: | 6.04.06 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The ESR instrumentation system shall include a system to measure transverse beam profiles. | ||
Comments: |
Record Date: 02/24/2025 18:26 | |||
Identifier: | F-ESR-INST.05 | WBS: | 6.04.06 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The ESR instrumentation system shall include a system to measure transverse beam profiles | ||
Comments: |
Record Date: 01/27/2025 16:43 | |||
Identifier: | F-ESR-INST.5 | WBS: | 6.04.06 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Reviewed | |
Description: | The instrumentation system shall include a system to measure transverse beam profiles | ||
Comments: |
Parents | |
G-ESR.03 | The ESR shall provide electron bunches having the bunch parameters specified in the MPT. [Document#:EIC-SEG-RSI-005] |
G-ESR.17 | The ESR shall have provisions made to accommodate a control system which can operate the ESR consistent will the overall control of the EIC and other EIC systems and to ensure the ESR meets all the Physics requirements needed to deliver the physics goals of the EIC. |
Children | |
P-ESR-INST-TRANSFB.02 | The transverse feedback systems shall be capable of counteracting single-bunch rise times of 1 ms |
P-ESR-INST-TRANSFB.01 | Placeholder, Input needed TBD |
P-ESR-INST-TRANSFB.03 | Placeholder, Input needed TBD |
This function not yet implemented.