Electron Ion Collider
F-ESR-INST.01
Requirement details, history, relationships and interfaces associated with requirement F-ESR-INST.01
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 02/24/2025 18:26 | |||
Identifier: | F-ESR-INST.01 | WBS: | 6.04.06 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The ESR instrumentation system shall include dual-plane Beam Position Monitors (BPMs) adjacent to each vertically focusing quadrupole. Provisions shall be made in the vacuum chamber design to install additional dual-plane BPMs at the horizontally focusing quadrupoles, if needed. | ||
Comments: |
Record Date: 01/27/2025 16:43 | |||
Identifier: | F-ESR-INST.1 | WBS: | 6.04.06 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Reviewed | |
Description: | The instrumentation system shall include dual-plane beam position monitors (BPMs) adjacent to specified quadrupoles. | ||
Comments: |
Parents | |
G-ESR.03 | The ESR shall provide electron bunches having the bunch parameters specified in the MPT. [Document#:EIC-SEG-RSI-005] |
G-ESR.17 | The ESR shall have provisions made to accommodate a control system which can operate the ESR consistent will the overall control of the EIC and other EIC systems and to ensure the ESR meets all the Physics requirements needed to deliver the physics goals of the EIC. |
Children | |
P-ESR-INST-BPM-PU.01 | There shall be Dual plane BPM pick-ups shall be located at all vertically focusing quads,and at all quadrupoles within about +/- 100 meters around IP6 |
P-ESR-INST-BPM-PU.02 | There shall be NO BPMs at the horizontally focusing quadrupoles. |
P-ESR-INST-BPM-PU.03 | No single plane BPMs are required for the ESR |
P-ESR-INST-BPM-PU.04 | Special BPM pick-ups shall be located between the RF cavities in sector 10, for position resolution |
P-ESR-INST-BPM-PU.05 | The total number of ESR BPM pick-ups shall be 220 BPMs |
P-ESR-INST-BPM-PU.06 | The ESR BPM pick-ups shall be designed to provide the required measurement resolution over the range of H=+/- 10 V=+/- 5 mm |
P-ESR-INST-BPM-PU.07 | No ESR BPM pick-ups shall be required to have an unusual range of position requirements. |
P-ESR-INST-BPM-PU.08 | The BPM pick-up design shall ensure the simulated impedance is within the accepted overall ESR impedance budget. |
P-ESR-INST-BPM-PU.09 | The BPM pick-up shall be designed to ensure the maximim temperatures of the components (due to heating by the beam) are acceptable for reliability and operations, using thermal simulation software. |
P-ESR-INST-BPM-PU.10 | The BPM pick-ups shall be designed to be baked to 250 °C for a sufficiently large number of thermal cycles. |
P-ESR-INST-BPM-PU.12 | The relative alignment of the BPMs and neighboring quads, after BBA shall be <20 µm |
P-ESR-INST-BPM-PU.11 | The BPM pick-up installation mechanical misalignment tolerance shall be same as for the quadrupoles. 100 µm |
P-ESR-INST-BPM-PU.13 | The BPM pick-up operational misalignement tolerance variations due to thermal cycling of the ESR shall be <20 µm |