Requirement Details
Electron Ion Collider
R-ESR-INST-DCCT-CM.04.03
Requirement details, history, relationships and interfaces associated with requirement R-ESR-INST-DCCT-CM.04.03
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 09/24/2025 00:45 | |||
Identifier: | R-ESR-INST-DCCT-CM.04.03 | WBS: | 6.04.06.02 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | Water Group shall provide the LCW piping design and procurement of materials from the wall distribution to connections to the DC current transformer cooling loops which satisfies the Instrumentation Group design, including waterflow switches and one contact per switch. | ||
Comments: |
No archive versions
Parents | |
No parents. | |
Children | |
No children. |
This function not yet implemented.