Requirement Details
Electron Ion Collider

R-ESR-INST-DCCT-CM.03.03
Requirement details, history, relationships and interfaces associated with requirement R-ESR-INST-DCCT-CM.03.03
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 01/08/2026 01:33 | |||
| Identifier: | R-ESR-INST-DCCT-CM.03.03 | WBS: | 6.04.06.02 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Reviewed | |
| Description: | ASR System Installation and Final Integration shall provide funding and scheduling to install DC current transformer temperature control design by the appropriate technical support group which satisfies the Vacuum Group design. | ||
| Comments: | |||
| Record Date: 09/24/2025 00:45 | |||
| Identifier: | R-ESR-INST-DCCT-CM.03.03 | WBS: | 6.04.06.02 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | Accelerator Installation Group shall provide funding and scheduling to install DC current transformer thermal sheilding design by the appropriate technical support group which satisfies the Vacuum Group design. | ||
| Comments: | |||
| Parents | |
| No parents. | |
| Children | |
| No children. |
This function not yet implemented.