Requirement Details
Electron Ion Collider
P-ESR-INST-BPM-PU.11
Requirement details, history, relationships and interfaces associated with requirement P-ESR-INST-BPM-PU.11
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 12/06/2024 11:10 | |||
Identifier: | P-ESR-INST-BPM-PU.11 | WBS: | 6.04.06.01 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | The BPM pick-up installation mechanical misalignment tolerance shall be same as for the quadrupoles. 100 µm | ||
Comments: |
No archive versions
Parents | |
F-EIS.8 | EIS shall have all the beam instrumentation necessary to deliver the operational parameters set forth in [5.9]. |
F-ESR-INST.1 | The instrumentation system shall include dual-plane beam position monitors (BPMs) adjacent to specified quadrupoles. |
F-ESR-INST.2 | The BPMs shall have turn-by-turn orbit measurement capability based on a single, remotely selectable bunch out of the fully filled bunch train to enable injection optimization. |
Children | |
No children. |
This function not yet implemented.