| Record Date: 10/13/2025 08:07 | |||
| Identifier: | P-ESR-INST-BPM-PU.11 | WBS: | 6.04.06.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Not Applicable | |
| Description: | The roll angle error of the ESR BPM pickup, given as the horizontal measurement plane defined by the BPM fiducials wrt. the horizontal plane of the ESR ring shall be less than +/- 20 mrad. | ||
| Comments: | |||
| Record Date: 10/08/2025 12:43 | |||
| Identifier: | P-ESR-INST-BPM-PU.11 | WBS: | 6.04.06.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Reviewed | |
| Description: | The roll angle error of the ESR BPM pickup, given as the horizontal measurement plane defined by the BPM fiducials wrt. the horizontal plane of the ESR ring shall be less than +/- 20 mrad. | ||
| Comments: | |||
| Record Date: 10/03/2025 04:06 | |||
| Identifier: | P-ESR-INST-BPM-PU.11 | WBS: | 6.04.06.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Not Applicable | |
| Description: | The ESR Beam Position Monitor Button configuration will be mirror symmetric with respect to the mid-and center planes. Deviation from symmetry shall be such that corresponding BPM reading errors are less then 20 microns. | ||
| Comments: | |||
| Record Date: 09/24/2025 00:45 | |||
| Identifier: | P-ESR-INST-BPM-PU.11 | WBS: | 6.04.06.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The ESR Beam Position Monitor Button configuration will be mirror symmetric with respect to the mid-and center planes. Deviation from symmetry shall be such that corresponding BPM reading errors are less then 20 microns. | ||
| Comments: | |||
| Record Date: 07/30/2025 23:43 | |||
| Identifier: | P-ESR-INST-BPM-PU.11 | WBS: | 6.04.06.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | The ESR BPM Pickup shall be designed to operate in an ambient temperature degree from X (C) to X (C). | ||
| Comments: | |||
| Record Date: 07/25/2025 02:58 | |||
| Identifier: | P-ESR-INST-BPM-PU.11 | WBS: | 6.04.06.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The ESR BPM Pickup shall be designed to operate in an ambient temperature degree from X (C) to X (C). | ||
| Comments: | |||
| Record Date: 05/16/2025 17:04 | |||
| Identifier: | P-ESR-INST-BPM-PU.11 | WBS: | 6.04.06.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | The BPM pick-up installation mechanical misalignment tolerance shall be same as for the quadrupoles. 100 µm | ||
| Comments: | |||
| Record Date: 05/15/2025 20:34 | |||
| Identifier: | P-ESR-INST-BPM-PU.11 | WBS: | |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | ||
| Description: | The BPM pick-up installation mechanical misalignment tolerance shall be same as for the quadrupoles. 100 µm | ||
| Comments: | |||
| Record Date: 02/13/2025 19:28 | |||
| Identifier: | P-ESR-INST-BPM-PU.11 | WBS: | 6.04.06.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | The BPM pick-up installation mechanical misalignment tolerance shall be same as for the quadrupoles. 100 µm | ||
| Comments: | |||
| Record Date: 01/28/2025 17:40 | |||
| Identifier: | P-ESR-INST-BPM-PU.11 | WBS: | 6.04.06.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | The BPM pick-up installation mechanical misalignment tolerance shall be same as for the quadrupoles. 100 μm | ||
| Comments: | |||
| Record Date: 01/27/2025 16:43 | |||
| Identifier: | P-ESR-INST-BPM-PU.11 | WBS: | 6.04.06.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | The BPM pick-up installation mechanical misalignment tolerance shall be same as for the quadrupoles. 100 µm | ||
| Comments: | |||
| Parents | |
| F-ESR-INST.01 | The ESR instrumentation system shall include dual-plane Beam Position Monitors (BPMs) adjacent to each vertically focusing quadrupole. Provisions shall be made in the vacuum chamber design to install additional dual-plane BPMs at the horizontally focusing quadrupoles, if needed. |
| F-EIS-INST.1 | EIS shall have all the beam instrumentation necessary to deliver the operational parameters set forth in the MPT. [Document#:EIC-SEG-RSI-005] |
| F-ESR-INST.02 | The ESR BPMs shall have turn-by-turn orbit measurement capability based on a single, remotely selectable bunch out of the fully filled bunch train to enable injection optimization. |
| Children | |