Requirement Details
Electron Ion Collider

P-ESR-INST-BPM-PU.07
Requirement details, history, relationships and interfaces associated with requirement P-ESR-INST-BPM-PU.07
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 10/03/2025 04:06 | |||
| Identifier: | P-ESR-INST-BPM-PU.07 | WBS: | 6.04.06.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Not Applicable | |
| Description: | The ESR Beam Position Monitor Pick-Ups shall fulfill resolution requirements over the horizontal and vertical beam position range with respect to its fiducials of +/- 3 (mm). | ||
| Comments: | |||
| Record Date: 09/24/2025 00:45 | |||
| Identifier: | P-ESR-INST-BPM-PU.07 | WBS: | 6.04.06.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The ESR Beam Position Monitor Pick-Ups shall fulfill resolution requirements over the horizontal and vertical beam position range with respect to its fiducials of +/- 3 (mm). | ||
| Comments: | |||
| Record Date: 09/15/2025 03:49 | |||
| Identifier: | P-ESR-INST-BPM-PU.07 | WBS: | 6.04.06.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | The ESR Beam Position Monitor Pick-Ups shall be designed to ensure the maximum temperatures of the components (due to heating by the beam) are acceptable for reliability and operations of the EIC over the planned operational life of 20 (yrs). | ||
| Comments: | |||
| Record Date: 07/30/2025 23:43 | |||
| Identifier: | P-ESR-INST-BPM-PU.07 | WBS: | 6.04.06.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | The ESR Beam Position Monitor Pick-Ups shall be designed to ensure the maximum temperatures of the components (due to heating by the beam) are acceptable for reliability and operations. | ||
| Comments: | |||
| Record Date: 07/25/2025 02:58 | |||
| Identifier: | P-ESR-INST-BPM-PU.07 | WBS: | 6.04.06.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The ESR Beam Position Monitor Pick-Ups shall be designed to ensure the maximum temperatures of the components (due to heating by the beam) are acceptable for reliability and operations. | ||
| Comments: | |||
| Record Date: 05/16/2025 17:04 | |||
| Identifier: | P-ESR-INST-BPM-PU.07 | WBS: | 6.04.06.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | No ESR BPM pick-ups shall be required to have an unusual range of position requirements. | ||
| Comments: | |||
| Record Date: 05/15/2025 20:34 | |||
| Identifier: | P-ESR-INST-BPM-PU.07 | WBS: | |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | ||
| Description: | No ESR BPM pick-ups shall be required to have an unusual range of position requirements. | ||
| Comments: | |||
| Record Date: 01/27/2025 16:43 | |||
| Identifier: | P-ESR-INST-BPM-PU.07 | WBS: | 6.04.06.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | No ESR BPM pick-ups shall be required to have an unusual range of position requirements. | ||
| Comments: | |||
| Parents | |
| F-ESR-INST.01 | The ESR instrumentation system shall include dual-plane Beam Position Monitors (BPMs) adjacent to each vertically focusing quadrupole. Provisions shall be made in the vacuum chamber design to install additional dual-plane BPMs at the horizontally focusing quadrupoles, if needed. |
| F-EIS-INST.1 | EIS shall have all the beam instrumentation necessary to deliver the operational parameters set forth in the MPT. [Document#:EIC-SEG-RSI-005] |
| F-ESR-INST.02 | The ESR BPMs shall have turn-by-turn orbit measurement capability based on a single, remotely selectable bunch out of the fully filled bunch train to enable injection optimization. |
| Children | |
| No children. | |
This function not yet implemented.