Requirement Details
Electron Ion Collider
P-ESR-INST-BPM-PU.01
Requirement details, history, relationships and interfaces associated with requirement P-ESR-INST-BPM-PU.01
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 01/27/2025 16:43 | |||
Identifier: | P-ESR-INST-BPM-PU.01 | WBS: | 6.04.06.01 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | There shall be Dual plane BPM pick-ups shall be located at all vertically focusing quads,and at all quadrupoles within about +/- 100 meters around IP6 | ||
Comments: |
No archive versions
Parents | |
F-EIS-INST.1 | EIS shall have all the beam instrumentation necessary to deliver the operational parameters set forth in the MPT. [Document#:EIC-SEG-RSI-005] |
F-ESR-INST.01 | The ESR instrumentation system shall include dual-plane Beam Position Monitors (BPMs) adjacent to each vertically focusing quadrupole. Provisions shall be made in the vacuum chamber design to install additional dual-plane BPMs at the horizontally focusing quadrupoles, if needed. |
F-ESR-INST.02 | The ESR BPMs shall have turn-by-turn orbit measurement capability based on a single, remotely selectable bunch out of the fully filled bunch train to enable injection optimization. |
Children | |
No children. |
This function not yet implemented.