Requirement Details
Electron Ion Collider

R-ESR-INST-BPM-ELEC.03.02
Requirement details, history, relationships and interfaces associated with requirement R-ESR-INST-BPM-ELEC.03.02
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 01/08/2026 01:33 | |||
| Identifier: | R-ESR-INST-BPM-ELEC.03.02 | WBS: | 6.04.06.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | ASR System Installation and Final Integration shall provide funding and scheduling for the design and AC cable tray to contain the AC cable distribution from the wall mount distribution to each beam position monitor electronic rack. | ||
| Comments: | |||
| Record Date: 09/24/2025 00:45 | |||
| Identifier: | R-ESR-INST-BPM-ELEC.03.02 | WBS: | 6.04.06.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | Infustructure Group shall provide design and funding for AC cable tray to contain the AC cable distribution from the wall mount distribution to each beam position monitor electronic rack. | ||
| Comments: | |||
| Parents | |
| No parents. | |
| Children | |
| No children. |
This function not yet implemented.