Requirement Details
Electron Ion Collider

F-ESR-INJ-DUMP.07
Requirement details, history, relationships and interfaces associated with requirement F-ESR-INJ-DUMP.07
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 02/09/2026 20:55 | |||
| Identifier: | F-ESR-INJ-DUMP.07 | WBS: | 6.04.04.03.01.02 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The ESR vertical half aperture for the circulating beam at the location of the replacement beam dump shall correspond to at least 15 vertical RMS beam sizes, assuming a fully coupled beam based on the emittances defined in the MPT, plus an additional 5 mm. [Document#: EIC-SEG-RSI-005] | ||
| Comments: | |||
| Record Date: 08/19/2025 23:16 | |||
| Identifier: | F-ESR-INJ-DUMP.07 | WBS: | 6.06.03 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The ESR vertical half aperture for the circulating beam at the location of the replacement beam dump shall correspond to at least 15 vertical RMS beam sizes, assuming a fully coupled beam based on the emittances defined in the MPT, plus an additional 5 mm. [Document#: EIC-SEG-RSI-005] | ||
| Comments: | |||
| Parents | |
| No parents. | |
| Children | |
| No children. |
This function not yet implemented.