Requirement Details
Electron Ion Collider

F-ESR-INJ-DUMP.06
Requirement details, history, relationships and interfaces associated with requirement F-ESR-INJ-DUMP.06
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 02/09/2026 20:55 | |||
| Identifier: | F-ESR-INJ-DUMP.06 | WBS: | 6.04.04.03.01.02 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The ESR horizontal half aperture for the circulating beam at the location of the replacement beam dump shall correspond to at least 15 horizontal RMS beam sizes, based on the emittances defined in the Master Parameter Table (MPT), plus an additional 10 mm. [Document#: EIC-SEG-RSI-005] | ||
| Comments: | |||
| Record Date: 08/19/2025 23:16 | |||
| Identifier: | F-ESR-INJ-DUMP.06 | WBS: | 6.06.03 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The ESR horizontal half aperture for the circulating beam at the location of the replacement beam dump shall correspond to at least 15 horizontal RMS beam sizes, based on the emittances defined in the Master Parameter Table (MPT), plus an additional 10 mm. [Document#: EIC-SEG-RSI-005] | ||
| Comments: | |||
| Parents | |
| No parents. | |
| Children | |
| No children. |
This function not yet implemented.