Requirement Details
Electron Ion Collider
P-ESR-CONT-SPIN.4
Requirement details, history, relationships and interfaces associated with requirement P-ESR-CONT-SPIN.4
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 10/10/2024 14:48 | |||
Identifier: | P-ESR-CONT-SPIN.4 | WBS: | 6.07.02 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | The number of bunches @ 10GeV and below shall be 1160 cnt | ||
Comments: |
No archive versions
Parents | |
F-ESR-CONT.6 | The ESR control system shall facilitate all physics application support required. |
F-ESR-RF.8 | The RF system controls shall be designed to handle the transient beam loading for all necessary bunch patterns. |
F-ESR.6 | The ESR shall deliver a spin polarized electron beam with time-averaged polarization of at least 70 percent. |
F-ESR.8 | The polarization lifetime maximum optimization shall be accomplished by proper spin matching which minimizes the spin diffusion. |
F-ESR.9 | The ESR shall be capable of continuously replacing all polarized electron bunches in the ring while the electron beam is in collision with a hadron beam allowing it to provide arbitrary spin patterns for the collider experiments. |
Children | |
No children. |
This function not yet implemented.