Requirement Details
Electron Ion Collider
P-ESR-CONT-ALGNMNT.1
Requirement details, history, relationships and interfaces associated with requirement P-ESR-CONT-ALGNMNT.1
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 12/06/2024 11:10 | |||
Identifier: | P-ESR-CONT-ALGNMNT.1 | WBS: | 6.07.02 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | The BBA quad strength command output rate shall be 1 Hz | ||
Comments: |
No archive versions
Parents | |
F-ESR-CONT.1 | The ESR control system shall facilitate all ESR global control requirements.  |
F-ESR-CONT.2 | The ESR control system shall facilitate all network, relational database and data archiving required. |
F-ESR-CONT.3 | The control system shall facilitate all machine protection systems required |
F-ESR-CONT.5 | The ESR control system shall facilitate fast feedback integration systems required. The child for this are in the IR need to identify the magnets . These will be low inductance correctors . |
F-ESR-CONT.4 | The ESR control system shall facilitate all EIC machine timing required. |
F-ESR-CONT.6 | The ESR control system shall facilitate all physics application support required. |
F-ESR-MAG.7 | The maximum integrated field strength of the FODO sextupoles needs to be sufficient to provide chromatic correction at all energies from 5 to 18 GeV with two low-beta interaction regions. |
Children | |
No children. |
This function not yet implemented.