Requirement Details
Electron Ion Collider
G-EIS.3x
Requirement details, history, relationships and interfaces associated with requirement G-EIS.3x
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 03/13/2025 17:22 | |||
Identifier: | G-EIS.3x | WBS: | 6.03 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Not Applicable | |
Description: | All EIS components and systems shall be designed and installed in line with all relevant relagutaory codes and in full compliance with BNL SBMS. | ||
Comments: |
No archive versions
Parents | |
G-GBL-SAFETY_CRYO&PRESS.05 | The completed collider complex must comply to ISO 21013-3 Cryogenic vessels - Pressure-relief accessories for cryogenic service Part 3: Sizing capacity determination |
G-GBL-ENVIRON.18 | In order to minimize the impact of the EIC on the Trees and Plants/Protected Native Plants, 6 NYCRR 193.3 |
G-GBL-SAFETY_ODH.01 | Oxygen deficiency hazards must be avoided by providing oxygen monitoring, ventilation, adequate warning systems and corresponding training of operating and maintenance staff. |
Children | |
F-EIS-HETL-ESR-INJ.2 | Each electron bunch from the transfer line shall be injected into ESR in its own injection cycle. In a manner that minimizes the background on the detector system. |
F-EIS-PROT-ABORT.2 | The RCS beam abort system shall have a beam inhibit interlock to prevent the Pre-Injector injecting fresh bunches into the RCS under fault conditions. |
F-EIS-PROT-ABORT.1 | The RCS shall have a beam abort system which will use a soft dump process that does not require a dedicated beam dump. |
F-EIS-PROT-COLL.1 | The RCS shall have a collimation system to protect all other apertures in the RCS. |
F-EIS-PROT-DUMP.1 | The Pre-Injector shall have strategically placed beam dumps for machine protection, commissioning and diagnostics as required. |
This function not yet implemented.