Requirement Details
Electron Ion Collider
P-EIS-RCS-RF-MAIN_RF-MERGE1_MODE.42
Requirement details, history, relationships and interfaces associated with requirement P-EIS-RCS-RF-MAIN_RF-MERGE1_MODE.42
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 12/06/2024 11:10 | |||
Identifier: | P-EIS-RCS-RF-MAIN_RF-MERGE1_MODE.42 | WBS: | 6.08.05.01 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | The following specific control requirements from beam dynamics shall be met TBD | ||
Comments: |
No archive versions
Parents | |
F-EIS-RCS-RF.1 | The RF system shall Provide a maximum RF voltage of 60MV to accelerate the beam. |
F-EIS-RCS-RF.2 | The total RF power provided by the RF amplifiers shall be able to compensate for all additional losses created by the stored electron beam in addition to the acceleration and synchrotron losses. |
F-EIS-RCS-RF.3 | The RF system shall Provide sufficient gradient to allow installation of all necessary RF modules in the limited space in IR 10. |
F-EIS-RCS-RF.4 | The RF system shall be able to accommodate 4 circulating bunches in one trains of 4 bunches. |
F-EIS-RCS-RF.6 | The RF system shall be able to accelerate final large, merged bunch to the operating energies needed by the ESR as set forth in [5.9]. |
F-EIS-RCS-RF.5 | The RF system shall be able to merge the one train of 4 bunches into two larger separate circulating bunches then merge these two large bunches into a single larger circulating bunch. |
F-EIS-RCS-RF.7 | The RF system controls shall be designed to handle the transient beam loading for all bunch structures. |
Children | |
No children. |
This function not yet implemented.