Requirement Details
Electron Ion Collider
F-EIS-RCS-INST-TUNE.1
Requirement details, history, relationships and interfaces associated with requirement F-EIS-RCS-INST-TUNE.1
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 12/06/2024 11:10 | |||
Identifier: | F-EIS-RCS-INST-TUNE.1 | WBS: | 6.03 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | The instrumentation system shall contain a betatron and synchrotron tune monitors. | ||
Comments: |
No archive versions
Parents | |
G-EIS.2 | The EIS shall provide an electron beam having sufficient energy to meet the ESR beam requirements as set forth in [5.9]. |
G-EIS.4 | The EIS pre-injector shall provide an electron beam to the ESR having a horizontal beam emittance which is compatible with operation of the ESR. |
G-EIS.3 | The EIS shall provide an electron beam with the RMS bunch momentum spreads at extraction which meet the ESR beam requirements as set forth in [5.9]. |
G-EIS.5 | The EIS pre-injector shall provide an electron beam to the ESR having a vertical beam emittance which is compatible with operation of the ESR. |
G-EIS.6 | The EIS shall inject into the ESR at a rate of 1[Hz]. |
G-EIS.7 | The EIS shall inject one bunch into the ESR whilst being able to provide 2 bunches per injection cycle. |
G-EIS.8 | The EIS shall provide an electron beam to the ESR having RMS Bunch lengths at extraction to meet beam requirements as set forth in [5.9]. |
G-EIS.9 | The EIS shall provide an electron beam to the ESR having the bunch charge at extraction to meet the beam requirements as set forth in [5.9]. |
G-EIS.10 | The ESR bunch replacement pattern will be defined by 1.the required polarization pattern to be provided to the experiments, 2.decay rates and 3. The RF cogging limitations of the beam transfer between RCS and ESR. |
Children | |
P-EIS-RCS-INST-TM.1 | Stripline kickers (H & V) shall be installed in the RCS to kick the beam so tunes can be measured by the turn-by-turn BPMs as well as to blow up vertical emittance at end of ramp |
P-EIS-RCS-INST-TM.2 | The design of the kickers shall adhere to the impedance budget requirement for the RCS ring |
P-EIS-RCS-INST-TM.3 | The amount of kick that the horizontal and vertical kickers shall provide is 0.2 mrad |
P-EIS-RCS-INST-TM.4 | The kicker waveform parameters (pulse shape and length) shall be Pulse shape rectangular dt=2.4 to 5mS mS |
P-EIS-RCS-INST-TM.5 | The location of the kickers shall be near low beta value |
P-EIS-RCS-INST-TM.6 | The kickers HV PS's shall have the capability to pulse twice per second: Once for tune and once for emittance blow up |
This function not yet implemented.