Requirement Details
Electron Ion Collider
P-EIS-RCS-INST-TM.1
Requirement details, history, relationships and interfaces associated with requirement P-EIS-RCS-INST-TM.1
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 10/10/2024 14:48 | |||
Identifier: | P-EIS-RCS-INST-TM.1 | WBS: | 6.03.02.05 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | Stripline kickers (H & V) shall be installed in the RCS to kick the beam so tunes can be measured by the turn-by-turn BPMs as well as to blow up vertical emittance at end of ramp | ||
Comments: |
No archive versions
Parents | |
F-EIS-RCS-INST-TUNE.1 | The instrumentation system shall contain a betatron and synchrotron tune monitors. |
F-EIS.8 | EIS shall have all the beam instrumentation necessary to deliver the operational parameters set forth in [5.9]. |
Children | |
No children. |
This function not yet implemented.