Requirement Details
Electron Ion Collider

P-EIS-RCS-INST-BPM-ELEC.03
Requirement details, history, relationships and interfaces associated with requirement P-EIS-RCS-INST-BPM-ELEC.03
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 05/16/2025 17:04 | |||
| Identifier: | P-EIS-RCS-INST-BPM-ELEC.03 | WBS: | 6.03.02.05.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | Measurement resolution for 4 bunch train & 2 bunch train (before merges), single turn, (1 nC) pilot bunch shall be < 1 mm | ||
| Comments: | |||
| Record Date: 05/15/2025 20:34 | |||
| Identifier: | P-EIS-RCS-INST-BPM-ELEC.03 | WBS: | |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | ||
| Description: | Measurement resolution for 4 bunch train & 2 bunch train (before merges), single turn, (1 nC) pilot bunch shall be < 1 mm | ||
| Comments: | |||
| Record Date: 02/13/2025 19:28 | |||
| Identifier: | P-EIS-RCS-INST-BPM-ELEC.03 | WBS: | 6.03.02.05.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | Measurement resolution for 4 bunch train & 2 bunch train (before merges), single turn, (1 nC) pilot bunch shall be < 1 mm | ||
| Comments: | |||
| Record Date: 01/27/2025 16:43 | |||
| Identifier: | P-EIS-RCS-INST-BPM-ELEC.03 | WBS: | 6.03.02.05.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | Measurement resolution for 4 bunch train & 2 bunch train (before merges), single turn, (1 nC) pilot bunch shall be < 1 mm | ||
| Comments: | |||
| Parents | |
| F-EIS- RCS-INST.1 | The instrumentation system shall contain a Beam Position Monitor system consisting of dual-plane Beam Position Monitors adjacent to each quadrupole. |
| F-EIS- RCS-INST.2 | Select Beam Position Monitors in the injection region shall have turn-by-turn orbit measurement capability based on a single, remotely selectable bunch out of the fully filled bunch train to enable injection optimization. |
| F-EIS- RCS-INST.9 | The RCS shall contain a beam-based alignment system. |
| F-EIS-INST.1 | EIS shall have all the beam instrumentation necessary to deliver the operational parameters set forth in the MPT. [Document#:EIC-SEG-RSI-005] |
| Children | |
| No children. | |
This function not yet implemented.