Requirement Details
Electron Ion Collider
F-EIS-RCS-INST-BP.3
Requirement details, history, relationships and interfaces associated with requirement F-EIS-RCS-INST-BP.3
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 03/17/2025 17:06 | |||
Identifier: | F-EIS-RCS-INST-BP.3 | WBS: | 6.03.02 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Not Applicable | |
Description: | The longitudinal bunch profile monitor needs turn-by-turn capability based on a single bunch in the fully filled bunch train to allow timing and energy adjustment for injection optimization. | ||
Comments: |
Record Date: 01/27/2025 16:43 | |||
Identifier: | F-EIS-RCS-INST-BP.3 | WBS: | 6.03.02 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | The longitudinal bunch profile monitor needs turn-by-turn capability based on a single bunch in the fully filled bunch train to allow timing and energy adjustment for injection optimization. | ||
Comments: |
Parents | |
G-EIS.9 | The EIS shall provide an electron beam to the ESR having the bunch charge at extraction to meet the beam requirements as set forth in the MPT. [Document#:EIC-SEG-RSI-005] |
G-EIS.2 | The EIS shall provide an electron beam having sufficient energy to meet the ESR beam requirements as set forth in the MPT. [Document#:EIC-SEG-RSI-005] |
G-EIS.3 | The EIS shall provide an electron beam with the RMS bunch momentum spread at extraction which meet the ESR beam requirements as set forth in the MPT. [Document#:EIC-SEG-RSI-005] |
G-EIS.4 | The EIS pre-injector shall provide an electron beam to the ESR having a horizontal beam emittance which is compatible with operation of the ESR. |
G-EIS.5 | The EIS pre-injector shall provide an electron beam to the ESR having a vertical beam emittance which is compatible with operation of the ESR. |
G-EIS.6 | The EIS shall inject into the ESR at a rate of 1[Hz]. |
G-EIS.7 | The EIS shall inject one bunch into the ESR whilst being able to provide 1 bunch per injection cycle. |
G-EIS.8 | The EIS shall provide an electron beam to the ESR having RMS Bunch lengths at extraction to meet beam requirements as set forth in the MPT. [Document#:EIC-SEG-RSI-005] |
G-EIS.10 | The EIS bunch replacement process shall deliver polarized replacement bunches capable of creating all the ESR polarization patterns needed to meet the physics goals. |
Children | |
P-EIS-RCS-INST-TPM.01 | Plunging YAG/OTR PM screen stations will be installed in the RCS ring to facilitate commissioning and re-establishing beam |
P-EIS-RCS-INST-TPM.02 | The YAG/OTR PM shall be located as follows : one in each straight section (6), and one after the injection septum(1). Making a Total of 7 - |
P-EIS-RCS-INST-TPM.03 | The exact locations in the straight sections shall be tbd - |
P-EIS-RCS-INST-TPM.05 | Each measurement station will provide three possible options, inserted YAG screen, inserted OTR screen, and an impedance matched sleeve connected with RF fingers during normal operations. |
P-EIS-RCS-INST-TPM.04 | The optical resolution for beam profile measurements shall be <50 microns |
P-EIS-RCS-INST-TPM.06 | Provisions shall be made so that the impedance match sleeve cannot be inadvertently retracted during normal operations. |
This function not yet implemented.