Requirement Details
Electron Ion Collider
P-EIS-RCS-CONT.2
Requirement details, history, relationships and interfaces associated with requirement P-EIS-RCS-CONT.2
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 01/27/2025 16:43 | |||
Identifier: | P-EIS-RCS-CONT.2 | WBS: | 6.07.02 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | The beam based alignment BPM's shall be placed in the following locations tbd | ||
Comments: |
No archive versions
Parents | |
F-EIS.11 | The EIS control system shall facilitate all EIC global control requirements. |
F-EIS.12 | The EIS control system shall facilitate all network, relational database and data archiving required. |
F-EIS.13 | The control system shall facilitate all machine protection systems required |
F-EIS.14 | The EIS control system shall facilitate all EIC machine timing required. |
F-EIS.15 | The EIS control system shall facilitate fast feedback integration systems required. |
F-EIS.16 | The EIS control system shall facilitate all physics application support required. |
Children | |
No children. |
This function not yet implemented.